Press release No. 07/23 - Konrad Repository Construction work on the Konrad repository has reached an advanced stage, and all new buildings on the Konrad 1 site have now been built. Konrad 1 is the  ...
Press release No. 08/24 - Repository search Experts discuss the disposal of radioactive waste in clay and clay rocks The Bundesgesellschaft für Endlagerung (BGE), in collaboration with the Federal  ...
Press Release No. 03/22 - Asse The Bundesgesellschaft für Endlagerung (BGE) has awarded the design planning contract for the retrieval of radioactive waste from the 750-metre level of the Asse II  ...
Asse Preparations are being firmed up for the retrieval of radioactive waste from the Asse II mine: on Monday, the Federal Republic of Germany, as represented by the Bundesgesellschaft für  ...
Press release No. 06/24 - Konrad Construction of the Konrad repository in Salzgitter has reached the finishing straight. The first low- and intermediate-level radioactive waste is to be emplaced in  ...
Press release No. 12/23 - Repository Search Although many people consider the subject of nuclear energy closed since the last German nuclear power plants went offline in spring 2023, the opposite is  ...
Press release No. 03/24 - Asse As early as 2023, the Bundesgesellschaft für Endlagerung (BGE) observed irregularities in the collection of non-radioactive salt water volumes entering the facility. It  ...
Press Release No. 02/23 – Asse The BGE is publishing the final report on the “Development of a concept for characterising the radioactive waste to be retrieved from the Asse II mine” . This report  ...
Press Release No. 03/23 – Asse In the view of the Bundesgesellschaft für Endlagerung (BGE), the question as to whether the subsoil in the “Kuhlager” is fundamentally suitable for the construction of  ...