Main topics in relation to the Konrad repository
The main topics deal with individual aspects of the Konrad repository in greater detail.
Completion of the Konrad repository
The completion of the Konrad repository for low- and intermediate-level radioactive waste is taking longer than originally planned. This article on its completion explains how the BGE arrived at the predicted completion date in 2027.
Evaluation of the safety requirements for the Konrad repository (ÜsiKo)
As a responsible operator, the BGE is voluntarily conducting an evaluation of the safety requirements for the Konrad repository according to the state of the art of science and technology (ÜsiKo). Here, it presents the results.