BGE The composition of the new supervisory board of the Bundesgesellschaft für Endlagerung (BGE) has been determined and was decided yesterday by the cabinet. The supervisory board composed as  ...
Asse In the coming year, the Bundesgesellschaft für Endlagerung (BGE) plans to carry out 3D seismic measurements in the vicinity of the Asse II mine. The measuring area covers 37.5 square kilometres  ...
Endlagersuche With the magazine “Einblicke Standortauswahl” [Insights into the repository site selection], the Bundesgesellschaft für Endlagerung mbH (BGE) addresses a broader public nationwide for  ...
Asse The Bundesgesellschaft für Endlagerung (BGE) reports on the current status of the retrieval planning at today’s Asse-2 support group meeting. The focus is on the current plans for the retrieval  ...
Endlagersuche Two-day workshop on the research needs of the BGE ends with many recommendations On 19 and 20 March 2019, the Bundesgesellschaft für Endlagerung (BGE) discussed its research needs for  ...
Endlager Konrad The contract for the construction of the new headframe at the Konrad shaft repository has been awarded: The headframe on Konrad 2 is a core piece of the nuclear facilities on the  ...
574-site-search Preservation of a section as a place of remembrance The wall built around the Gorleben mine site will be demolished. A section of the wall will be preserved as a place of remembrance  ...
Asse Work has started on exploratory boreholes R 10 and R 11. The drilling sites for the planned boreholes are currently being prepared so that the drilling rig can be set up safely. First, the  ...