Asse The BGE adjusts its discharge request for the Bergmannssegen Hugo mine to the strict drinking water limit value s 13 March 2018 The Bundesgesellschaft für Endlagerung (BGE) has once again  ...
Endlager Konrad In order for waste containers to be brought to the Konrad repository, a transfer station must be built at a depth of 850 metres. There, the containers that have been transported into  ...
Asse Preparations are being firmed up for the retrieval of radioactive waste from the Asse II mine: on Monday, the Federal Republic of Germany, as represented by the Bundesgesellschaft für  ...
Asse In the coming year, the Bundesgesellschaft für Endlagerung (BGE) plans to carry out 3D seismic measurements in the vicinity of the Asse II mine. The measuring area covers 37.5 square kilometres  ...
Asse From February onwards, the Bundesgesellschaft für Endlagerung (BGE) is expanding its exploratory work east of the Asse II mine. The two new boreholes will represent an important step towards the  ...
Asse The Bundesgesellschaft für Endlagerung (BGE) reports on the current status of the retrieval planning at today’s Asse-2 support group meeting. The focus is on the current plans for the retrieval  ...
Asse On 30 June 2020, the Bundesgesellschaft für Endlagerung (BGE) started to backfill the “Reichelt swamps” of the Asse II mine in Remlingen. The “Reichelt swamps” are located in the north-west of  ...
Asse Work has started on exploratory boreholes R 10 and R 11. The drilling sites for the planned boreholes are currently being prepared so that the drilling rig can be set up safely. First, the  ...
BGE In Eschenstraße, the office space of the GBE has long been at maximum capacity. The new modular buildings are not enough to create the office workplaces needed. The BGE has now rented 68  ...
Endlager Konrad Based on an external expert report, the BGE expects construction to be completed in the first half of 2027 8 March 2018 The completion of the Konrad repository for low- and  ...